INDIAN INSTITUTE OF SCIENCE EDUCATION AND RESEARCH (IISER), TIRUPATI, ANDHRA PRADESH
A Khelo India Scheme Project
PROJECT OVERVIEW
Delivering a World Athletics-Standard Track and Full-Scope Football Ground to a Premier National Research Institution Under the Khelo India Scheme
- Gallant Sports & Infra Ltd was awarded this project as the L1 (lowest) bidder under a Government of India e-procurement tender, issued by The Registrar, IISER Tirupati
- The project involves the construction of a full 400m 8-lane synthetic athletic track certified to World Athletics (WA) Class 2 standards, along with an associated natural grass football ground, all under the Khelo India sports infrastructure scheme
- Scope covers complete civil base engineering, full WA-certified synthetic track surface with class 2 certification, all WA field event equipment, a Bermuda grass football ground with automated sprinkler irrigation, perimeter drainage, fencing, and all supporting infrastructure
- Delivery timeline: 8 calendar months from date of commencement
PROJECT SNAPSHOT
| Client | Indian Institute of Science Education and Research (IISER), Tirupati |
| Location | Yerpedu, Tirupati, Andhra Pradesh |
| Surfaces Delivered | WA Class 2 Certified 400m 8-Lane Synthetic Athletic Track · Natural Grass Football Ground |
| Certification | World Athletics (WA) Class 2 |
| Scheme | Khelo India — Ministry of Education, Government of India |
| Delivery Model | Government Tender — End-to-End Turnkey, Civil, Surface, Equipment and Certification |
| Contract Duration | 8 Months |
| Tender Outcome | L1 (Lowest Bidder) |
CLIENT OBJECTIVES AND OUR SOLUTION
| Client Requirement | Our Delivery |
| WA Class 2 certified 400m 8-lane synthetic athletic track | WA-certified sandwich system synthetic track with full Class 2 certification, covering normal and high-stress areas, with WA-standard lane and event markings |
| Complete field event infrastructure to WA specification | Full suite of WA-certified field equipment — aluminium kerbing, pole vault boxes and covers, long and triple jump take-off boards and tray sets, steeplechase pit and hurdles, hammer and discus ring with cage, shot put rings, and two sand filling pits |
| Natural grass football ground to FIFA standard | Bermuda grass football ground on engineered sub-grade with automated pop-up sprinkler irrigation system, FIFA-standard line marking, movable goal posts, and corner flags |
| Complete civil base and drainage infrastructure | Full base engineering including granular sub-base, WMM and bituminous layers, RCC drainage network, HDPE perforated sub-soil drainage, recharge pits, and perimeter chain link fencing |
| Supporting civil and anti-termite works | Paving, kerb stone edging, anti-termite treatment, weedicide application, and all site finishing works |
TECHNICAL SPECIFICATIONS
- Athletic Track: WA-certified sandwich system, 400m 8-lane configuration, minimum 15mm thickness across normal stress areas and enhanced thickness across high-stress zones, full WA Class 2 certification obtained including testing, documentation, and governing body approval
- Football Ground: Bermuda grass (Doob/Bermuda) on engineered sub-grade with automated pop-up sprinkler irrigation, FIFA-standard line marking, movable goal posts and corner flags
- Field Equipment: Full WA-certified complement — aluminium kerbing, pole vault infrastructure, long/triple jump boards and tray sets, sand pits, steeplechase pit and hurdles, combined hammer and discus cage, shot put and discus rings
- Civil Base: Multi-layer engineered base including granular sub-base (GSB), wet mix macadam (WMM), bituminous macadam, and bituminous concrete layers for the track, with separate engineered sub-grade preparation for the football ground
- Drainage: HDPE perforated sub-soil drainage network with recharge pits, RCC drainage with precast covers, and full perimeter drain system
- Fencing and Paving: PVC-coated GI chain link fencing, interlocking concrete paver blocks, kerb stone edging across the facility perimeter
- Construction Timeline: 8 months from date of commencement
PROJECT EXECUTION
- Site survey, topographic assessment, and preliminary design into working drawings, including structural and geotechnical design services
- Surface excavation, earth dressing, subgrade consolidation, and disposal of surplus material
- Supply and laying of good earth for the football ground, with weedicide and anti-termite treatment across the full field area
- Engineered multi-layer base construction for the athletic track — granular sub-base, WMM, bituminous macadam, and bituminous concrete layers, all to specified compaction tolerances
- Sub-soil HDPE perforated drainage network, recharge pit construction, and RCC drain installation across the full facility
- WA-certified synthetic track surface installation across normal and high-stress zones, with full WA-standard lane and field event markings
- Installation and commissioning of all WA-certified field event equipment
- Bermuda grass planting, rootzone preparation, and automated pop-up sprinkler irrigation system installation for the football ground
- FIFA-standard football ground line marking, movable goal post and corner flag installation
- Paver block laying, kerb stone edging, chain link fencing, and site finishing works
- WA Class 2 certification process — testing, documentation, and governing body approval
- Final quality inspection and project handover to IISER Tirupati
STRATEGIC IMPACT
For Athletes
- Access to a full WA Class 2 certified 400m 8-lane synthetic track, bringing competition-grade athletics infrastructure to a national scientific research institution
- Complete field event infrastructure across all WA disciplines, enabling training and competition across track, jumps, throws, and hurdles on a single campus
- Automated irrigation and engineered sub-grade on the football ground ensure year-round playability in all conditions
- Reduced injury risk through certified surface systems and engineered base construction across all zones
For the Community and Nation
- Part of the Government of India’s Khelo India initiative, bringing world-class athletics infrastructure to premier academic institutions beyond metro sporting hubs
- Provides IISER Tirupati with a nationally competitive athletics venue capable of hosting inter-university, state, and national-level championships
- Strengthens the government’s vision of building sports culture and athlete development within India’s academic ecosystem
- A lasting infrastructure asset for Andhra Pradesh, contributing to the state’s athletics talent pipeline
UNIQUE VALUE PROPOSITION
Government Tender Delivery Capability: Awarded as L1 bidder under a competitive Government of India e-procurement tender, demonstrating Gallant’s pricing competitiveness, technical compliance, and trust with central government institutions
Khelo India Infrastructure Track Record: Proven capability to execute government-funded sports infrastructure schemes, working within the documentation, compliance, and reporting standards that central scheme projects demand
WA Class 2 Certification End-to-End: Full responsibility for WA Class 2 certification, from base engineering tolerances through synthetic track laying to governing body testing and approval, all under a single contract
Complete Athletics and Football Facility: Turnkey delivery of a full athletics facility and natural grass football ground, managing civil, surfacing, field equipment, irrigation, drainage, and certification under one umbrella
CONCLUSION
The IISER Tirupati project is a defining Khelo India commission that demonstrates Gallant Sports & Infra Ltd’s ability to execute complex, government-tendered sports infrastructure at national scientific institutions. Delivering a WA Class 2 certified 400m 8-lane synthetic track, a complete suite of WA field event equipment, and a Bermuda grass football ground with automated irrigation, all within an 8-month timeline under central government tender conditions, this project reflects the technical depth, procurement capability, and institutional credibility that set Gallant apart.
For government bodies, sports authorities, and academic institutions commissioning sports infrastructure under central or state schemes, this project demonstrates our proven capability to deliver internationally certified, competition-grade facilities on time, to specification, and within the compliance framework that public sector projects demand.
