Project Overview
Dalhousie Public School, located in Siswan, New Chandigarh, carries the legacy of the renowned Dalhousie Public School of Dalhousie. Built on a 50-acre area, encircled by the pristine Siswan forest, this new institution was established with a decisive mission to create a wholesome educational atmosphere through premium sports infrastructure. Gallant Sports executed a 235-meter running track with six lanes utilizing 30mm superb non-infill turf at a site of 22,000 sq. ft.
The Need for the Project
As a new established school entering a competitive landscape, Dalhousie Public School needed more than classrooms — it needed confidence from parents. School management recognized that contemporary parenting evaluations surpass academic standards and include facilities that support physical growth along with extracurricular activities.
The school leadership’s vision for excellence required both a magnificent visual sporting environment and a practical setup to demonstrate their student health promotion priorities since the beginning of operations.
Gallant’s Solution
After analysing the client’s objectives and restrictions, Gallant recommended 30mm superb non-infill synthetic turf as the cost-effective yet durable solution. Other options like EPDM surfaces were also considered initially, the 30 mm non infill turf turned out to be a better alternative within the budget because it offered superior durability with minimal maintenance requirements, as well as a 7-year warranty.
We designed a solution that attained worldwide performance standards and safety requirements and simultaneously presented an appearance and operational capability that made a lasting sensory impact on parents and students.
Characteristics of our solution included:
- Non-infill turf with 30mm height represents an ideal solution for all-weather playgrounds that require minimum care.
- The application of white-marked customized turfs created permanent clean lane boundaries.
- The school management receives assurance through warranty coverage as well as after-sales service support.
Project Execution
Gallant Sports implemented the project development process in professional steps through their experienced team. Our experienced team undertook:
- PCC base work for structural stability.
- Side drains received construction for the purpose of managing surface runoff.
- The project included creating a surface that defined boundaries and achieved levelness through plinth formation.
- The precision-laid white turf lanes served for both the installation and marking of the turf field.
Each step followed strict attention to detail, which delivered exceptional performance together with aesthetic value.
Future Impact
The constructed facility of the track at Dalhousie Public School creates the first elements necessary to build up a dynamic sports tradition. The integrated track serves students through its daily role in encouraging physical activity, which promotes health benefits for them. Over time, it will:
- Enhance student participation in sports.
- Support physical education curriculum delivery.
- The school track will enhance its ability to attract new student families from prospective parents.
- Support inter-school athletics and events.
- The educational facility delivers much more than infrastructure because it stands as a representation of the school’s dedication to complete student development.
Final Thoughts
The running track at Dalhousie Public School Siswan has established itself as the most contemporary and friendly track for children in the area. With the right surface and the right vision, the school is now better equipped to nurture excellence on and off the track. The Gallant Sports team is excited to have helped in this mission to unite efficient budgeting with professional outcomes and enduring worth into a single solution.